• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7. Injector Harness Pass-Through Connectors.
Figure 1. Valve Cover -- Removal.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  623    624    625    626    627  628  629    630    631    632    633  
img
. . . . .
TM 5-3895-385-23-2
0327
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
VALVE COVER REMOVAL AND INSTALLATION
INITIAL SETUP:
Equipment Conditions
Tools and Special Tools
Engine hood assembly removed (WP 0433)
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
Turbocharger compressor outlet hose removed
3, Item 64)
(WP 0347)
Torque wrench (WP 0440, Vol 3, Item 83)
Breather tube removed (WP 0328)
Materials/Parts
Upper airflow pipe removed (WP 0365)
Valve cover gasket (1) (WP 0439, Vol 3, Item 34)
Estimated Time to Complete Task
Personnel Required
57.9 hr
91L
0327-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.