• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Valve Clearance Measurement.
VALVE COVER REMOVAL AND INSTALLATION

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  622    623    624    625    626  627  628    629    630    631    632  
img
. . . .
TM 5-3895-385-23-2
0326
Rocker Lever Assembly Adjustment -- Continued.
Figure 7. Injector Harness Pass-Through Connectors.
18. Connect fuel injector harness connectors W25 C3 and C4 (Figure 7, Item 2) to pass-through connectors
(Figure 7, Item 1).
END OF TASK
FOLLOW-ON TASK
1. Install battery-charging alternator belt (WP 0349).
2. Install valve cover (WP 0327).
3. Connect batteries (WP 0357).
4. Verify proper operation.
5. Dispose of soiled wiping rags In Accordance With (IAW) local Standard Operating Procedure (SOP).
END OF TASK
END OF WORK PACKAGE
0326-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.