• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Intake Air Heater Installation
Figure 1. Turbocharger Connections -- Removal.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  734    735    736    737    738  739  740    741    742    743    744  
img
. . .
TM 5-3895-385-23-2
0347
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
TURBOCHARGER AND TURBOCHARGER PLUMBING REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Materials/Parts -- Continued
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
O-ring (WP 0439, Vol 3, Item 62)
3, Item 64)
O-ring (WP 0439, Vol 3, Item 65)
Cap and plug set (WP 0440, Vol 3, Item 11)
O-ring (WP 0439, Vol 3, Item 66)
Drain pan (WP 0440, Vol 3, Item 15)
Wiping rags (WP 0439, Vol 3, Item 89)
Torque wrench (WP 0440, Vol 3, Item 83)
Personnel Required
Materials/Parts
91L
Gasket (WP 0439, Vol 3, Item 21)
Equipment Conditions
Gasket (WP 0439, Vol 3, Item 22)
Engine hood assembly removed (WP 0433)
Gasket (WP 0439, Vol 3, Item 26)
Air cleaner assembly removed (WP 0369)
Estimated Time to Complete Task
High temperature anti-seize (WP 0439, Vol 3, Item
2)
15 hr
Lubricating engine oil (WP 0439, Vol 3, Item 34)
0347-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.