TM 5-3895-385-23-2
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
RADIATOR COOLER COOLANT, HYDRAULIC, AND AIRFLOW HOSE REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Personnel Required
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
91L
3, Item 64)
References
Cap and plug set (WP 0440, Vol 3, Item 11)
Equipment Conditions
Drain pan (WP 0440, Vol 3, Item 15)
Engine off (TM 5-3895-385-10)
Materials/Parts
Wiping rag (WP 0439, Vol 3, Item 89)
Estimated Time to Complete Task
21.9 hr
RADIATOR COOLER COOLANT, HYDRAULIC, AND AIRFLOW HOSE REMOVAL AND INSTALLATION
NOTE
Fluids will leak from hoses and connection points when disconnected. Have a drain pan and rags
in place to capture fluids.