TM 5-3895-385-23-2
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
CYLINDER HEAD ASSEMBLY REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Equipment Conditions -- Continued
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
3, Item 64)
Suitable lifting device (136 lb (50.75 kg) minimum)
Battery-charging alternator removed (WP 0350)
Torque angle gauge (WP 0440, Vol 3, Item 20)
Torque wrench (WP 0440, Vol 3, Item 80)
Web sling (WP 0440, Vol 3, Item 66)
High-pressure fuel injector lines removed (WP
Materials/Parts
Anti-seize compound (WP 0439, Vol 3, Item 1)
Fuel rail removed (0337)
Cylinder head gasket (WP 0439, Vol 3, Item 29)
Detergent (WP 0439, Vol 3, Item 5)
Engine lubricating oil (WP 0439, Vol 3, Item 37)
Lock washer (2) (WP 0439, Vol 3, Item 116)
Lock washer (WP 0439, Vol 3, Item 119)
Estimated Time to Complete Task
Rocker housing gasket (WP 0439, Vol 3, Item 28)
82.8 hr
Personnel Required
91L
Assistant
Equipment Conditions
Engine off (TM 5-3895-385-10)
Engine cool
0325-1