TM 5-3895-385-23-2
0324
FOLLOW-ON TASK
1. Install battery-charging alternator belt (WP 0349).
3. Verify proper operation, and check for fluid leaks.
4. Dispose of captured fluids and soiled rags In Accordance With (IAW) local Standard Operating Procedure
(SOP).
END OF TASK
END OF WORK PACKAGE