• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Belt Tensioner Installation
Figure 1. Battery-Charging Alternator Electrical Connections.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  751    752    753    754    755  756  757    758    759    760    761  
img
. . .
TM 5-3895-385-23-2
0350
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
BATTERY-CHARGING ALTERNATOR AND BATTERY-CHARGING ALTERNATOR PULLEY REMOVAL AND
INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Equipment Conditions
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
Battery-charging alternator belt removed (WP
3, Item 64)
0349)
Estimated Time to Complete Task
Torque wrench (WP 0440, Vol 3, Item 80)
34.3 hr
Torque wrench (WP 0440, Vol 3, Item 83)
Personnel Required
91L
0350-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.