TM 5-3895-373-20C. ALIGN Continued.Screed operations present acrushing hazard. Stay clear of screedduring screed operations. Failure todo so may result in death or seriousinjury.NOTECribbing is used under the screedonly as a safety precaution. Do notlower the screed onto the cribbing.Cribbing may have to berepositioned during alignmentprocedure to allow for placement ofstraightedge and to viewmeasurementpoints.i.Place straightedge (10) across trailing edge ofboth extension screeds at A-A. The maximumheight difference allowed between the left andright extension screeds is 0.060 in. (1,5 mm).j.If measurement is less than 0.060 in. (1,5 mm)across A-A, go to step 2.k.If measurement is greater than 0.060 in. (1,5mm), it will be necessary to align extensionscreed guide shaft supports.l.Start paving machine engine and retractextension screed that is out of alignmenthalfway per TM 5-3895373-10.m.Shut down paving machine and remove keyfrom ignition per TM 5-3895-373-10. Positioncribbing under screed.GO TO NEXT PAGE15-143
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business