TM 5-3895-373-20C. ALIGN - Continued.WARNINGScreed operations present acrushing hazard. Stay clear ofscreed during screed operations.Failure to do so may result in deathor serious injury.NOTECribbing is used under the screedonly as a safety precaution. Do notlower the screed onto the cribbing.Cribbing may have to berepositioned during alignmentprocedure to allow for placement ofstraightedge and to viewmeasurement points.v.Remove one hex head cap screw (20).WARNINGThread locking compound solventcan cause eye damage. Wear safetygoggles/glasses when using. Avoidcontact with eyes. If compoundcontacts eyes, flush eyes with waterand get immediate medical attention.w.Clean threads of hex head cap screw (20)using thread locking compound solvent anda clean cloth.WARNINGThread locking compound can causeeye damage. Wear safetygoggles/glasses when using. Avoidcontact with eyes. If compoundcontacts eyes, flush eyes with waterand get immediate medical attention.x.Apply thread locking compound to threadsof hex head cap screw (20).y.Install hex head cap screw (20) and tightento 180 lb-ft (244 N.m) using socket wrenchadapter.z.Repeat steps u through x until all hex headcap screws (20) are installed and tightened.GO TO NEXT PAGE15-145
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business