TM 5-3895-373-2015.20. ADJUST AND ALIGN MAIN AND EXTENSION SCREED PLATES - Continued.C.ALIGN - Continued.2.ALIGN EXTENSION SCREED PLATES FLUSHWITH MAIN SCREED PLATES.WARNINGScreed operations present acrushing hazard. Stay clear ofscreed during screed operations.Failure to do so may result in deathor serious injury.NOTECribbing is used under the screedonly as a safety precaution. Do notlower the screed onto the cribbing.Cribbing may have to berepositioned during alignmentprocedure to allow for placement ofstraightedge and to viewmeasurement points.a.Start paving machine engine and fullyretract extension screed per TM 5-3895-373-10.b.Shut down paving machine and removekey from ignition per TM 5-3895-373-10.Position cribbing under screed.c.Place straightedge along bottom of mainscreed plate (11) and across inside ofextension screed plate (21) at B-B andacross outside of extension screed plate(22) at C-C.NOTEEnsure extension screed heightadjustment knobs are not separatedduring this procedure.d.Adjust extension screed height adjustmentknobs to align leading edges of extensionscreed plates (21 and 22) from 0.125 to0.19 in. (3,2 to 4,8 mm) higher than trailingedge of main screed plate (11) at B-B andC-C. It may be necessary to adjustextension screed height adjustment knobsto obtain 0.125 in. (3,2 mm) at both pointsB-B and C-C. (Refer to TM 5-3895-373-10.) If measurements cannot be obtainedat both B-B and C-C, repeat step 1.GO TO NEXT PAGE15-146
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business