TM 5-3895-373-20
D.
ASSEMBLE.
1.
ASSEMBLE AUGER FLIGHTS.
NOTE
Ensure the auger flight spiral is in
the correct direction when installing
left and right auger flights. If spiral
is not correct, paving material will
not spread evenly along main and
extension screeds.
a. Visually match the spiral direction of quarter
auger flights (25) and hemi auger flights (29) for
left or right hand sides prior to installation.
b. Install 1 ft extension shaft (31) into 2 ft
extension shaft (16).
c. Install teflon flat washers (30), hemi auger
flights (29), and hex head cap screws (28).
d. Install teflon flat washers (27), shaft covers (26),
quarter auger flights (25) and lockwashers (24).
Thread locking compound can cause
eye
damage.
Wear
safety
goggles/glasses when using. Avoid
contact with eyes. If compound
contacts eyes, flush eyes with water
and get immediate medical attention.
e. Apply thread locking compound (Item 12,
Appendix C) to threads of hex head cap screws
(28).
f. Install hex nuts (23) and tighten to 45 Ib-ft (61
N-m).
GO TO NEXT PAGE
15-129