TM 5-3895-373-10
i.
Remove hex nuts (11), flat washers (12), and
hex head cap screws (13). Remove extension
fender (14). Replace hex head cap screws, flat
washers, and hex nuts in extension fender
mounting holes after removal.
j.
Remove hex nut (1), lockwasher (2), hex head
cap screw (3), and shaft cover (4) from end of
auger extension shaft.
k.
Remove hex nut (6), lockwasher (7), shaft cover
(8), and flat washer (9). Remove hex head cap
screw (10) and auger extension assembly (5).
Replace hex head cap screw, flat washer, shaft
cover, lockwasher, and hex nut onto auger
extension assembly after removal.
l.
Install shaft cover (4) on main auger shaft using
hex head cap screw (3), lockwasher (2), and hex
nut (1).
m.
Start paving machine per paragraph 2.10.
n.
Place throttle control switch to "MAX" position.
o.
Place screed lift switch to the up, RAISE
position. Raise screed fully up.
p.
Remove wood support blocks from under each
end of main screed.
q.
Retract both left and right extension screeds per
paragraph 2.19.
r.
Ensure screed travel lock valve is open.
2-76