TM 5-3895-373-10i.Remove hex nuts (11), flat washers (12), andhex head cap screws (13). Remove extensionfender (14). Replace hex head cap screws, flatwashers, and hex nuts in extension fendermounting holes after removal.j.Remove hex nut (1), lockwasher (2), hex headcap screw (3), and shaft cover (4) from end ofauger extension shaft.k.Remove hex nut (6), lockwasher (7), shaft cover(8), and flat washer (9). Remove hex head capscrew (10) and auger extension assembly (5).Replace hex head cap screw, flat washer, shaftcover, lockwasher, and hex nut onto augerextension assembly after removal.l.Install shaft cover (4) on main auger shaft usinghex head cap screw (3), lockwasher (2), and hexnut (1).m.Start paving machine per paragraph 2.10.n.Place throttle control switch to "MAX" position.o.Place screed lift switch to the up, RAISEposition. Raise screed fully up.p.Remove wood support blocks from under eachend of main screed.q.Retract both left and right extension screeds perparagraph 2.19.r.Ensure screed travel lock valve is open.2-76
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business