TM 5-3895-373-10r.Place throttle control switch to "MAX" position.s.Place screed lift switch to the up, RAISEposition. Raise screed fully up.t.Remove wood support blocks from under eachend of main screed.CAUTIONUse care when retracting extensionscreeds with 1 ft auger and fenderextensions installed. Maximumretraction is 2 ft on each side.Damage to endgates will result ifextension screeds are retracted toofar.u.Retract both left and right extension screeds perparagraph 2.19.v.Ensure screed travel lock valve is open.w.Place screed lift switch to the down, FLOATposition. Lower the screed until the screed restson the ground.x.Shut down paving machine per paragraph 2.11,steps a through g.2.26.4. OneFootAugerandFenderExtensionRemoval.a.Start paving machine per paragraph 2.10.b.Place throttle control switch to "MAX" position.c.Place screed lift switch to the up, RAISEposition. Raise screed fully up.d.Fully extend both left and right extension screedsper paragraph 2.19.e.Place wood support blocks under each end ofmain screed. Wood supports must be 9 in.high.f.Ensure screed travel lock valve is open.g.Place screed lift switch to the down, FLOATposition. Lower the screed until the screed restson the wood blocks.h.Shut down paving machine per paragraph 2.11,steps a through g.2-75
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business