2.26.2
Cutoff Shoe Removal.
a.
Start paving machine per paragraph 2.10.
b.
Place throttle control switch to "MAX" position.
c.
Place screed lift switch to the up, RAISE
position. Raise screed fully up.
d.
Fully extend both left and right extension screeds
per paragraph 2.19.
e.
Place wood support blocks under each end of
main screed. Wood supports must be 9 in.
high.
TM 5-3895-373-10
f.
Ensure screed travel lock valve is open.
g.
Place screed lift switch to the down, FLOAT
position. Lower the screed until the screed rests
on the wood blocks.
h.
Shut down paving machine per paragraph 2.11,
steps a through g.
i.
Remove chain (5) from hook on strikeoff.
j.
Remove hex nuts (4), lockwashers (3), flat
washers (2), and cutoff shoe (1).
2-71