2.26.2CutoffShoeRemoval.a.Start paving machine per paragraph 2.10.b.Place throttle control switch to "MAX" position.c.Place screed lift switch to the up, RAISEposition. Raise screed fully up.d.Fully extend both left and right extension screedsper paragraph 2.19.e.Place wood support blocks under each end ofmain screed. Wood supports must be 9 in.high.TM 5-3895-373-10f.Ensure screed travel lock valve is open.g.Place screed lift switch to the down, FLOATposition. Lower the screed until the screed restson the wood blocks.h.Shut down paving machine per paragraph 2.11,steps a through g.i.Remove chain (5) from hook on strikeoff.j.Remove hex nuts (4), lockwashers (3), flatwashers (2), and cutoff shoe (1).2-71
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business