TM 5-3895-373-10
s.
Place throttle control switch to "MAX" position.
t.
Place screed lift switch to the up, RAISE
position. Raise screed fully up.
u.
Remove wood support blocks from under each
end of main screed.
CAUTION
Use care when retracting extension
screeds with 2 ft auger and fender
extensions
installed.
Maximum
retraction is 1 ft on each side.
Damage to end gates will result if
extension screeds are retracted too
far.
v.
Retract both left and right extension screeds per
paragraph 2.19.
w.
Ensure screed travel lock valve is open.
x.
Place screed lift switch to the down, FLOAT
position. Lower the screed until the screed rests
on the ground.
y.
Shut down paving machine per paragraph 2.11,
steps a through g.
2.26.6 Two Foot Auqer and Fender Extension Removal.
Two persons are required to remove the 2 ft auger and
fender extensions.
a.
Start paving machine per paragraph 2.10.
b.
Place throttle control switch to "MAX" position.
c.
Place screed lift switch to the up, RAISE
position. Raise screed fully up.
d.
Fully extend both left and right extension screeds
per paragraph 2.19.
e.
Place wood support blocks under each end of
main screed. Wood supports must be 9 in.
high.
f.
Ensure screed travel lock is open.
g.
Place screed lift switch to the down, FLOAT
position. Lower the screed until the screed rests
on the wood blocks.
h.
Shut down paving machine per paragraph 2.11,
steps a through g.
2-79