TM 5-3895-373-10f.Ensure screed travel lock is open.g.Place screed lift switch to the down, FLOATposition. Lower the screed until the screed restson the wood blocks.h.Shut down paving machine per paragraph 2.11,steps a through g.i.Install cutoff shoe (1) on the endgate using flatwashers (2), lockwashers (3), and hex nuts (4).j.Attach chain (5) to hook on strikeoff.k.Start paving machine per paragraph 2.10.l.Place throttle control switch to ’MAX" position.m. Place screed lift switch to the up, RAISEposition. Raise screed fully up.n.Remove wood support blocks from under eachend of main screed.o.Retract both left and right extension screeds perparagraph 2.19.p.Ensure screed travel lock is open.q.Place screed lift switch to the down, FLOATposition. Lower the screed until the screed restson the ground.r.Shut down paving machine per paragraph 2.11,steps a through g.2-70
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business