TM 5-3895-373-10
f.
Ensure screed travel lock is open.
g.
Place screed lift switch to the down, FLOAT
position. Lower the screed until the screed rests
on the wood blocks.
h.
Shut down paving machine per paragraph 2.11,
steps a through g.
i.
Install cutoff shoe (1) on the endgate using flat
washers (2), lockwashers (3), and hex nuts (4).
j.
Attach chain (5) to hook on strikeoff.
k.
Start paving machine per paragraph 2.10.
l.
Place throttle control switch to MAX" position.
m. Place screed lift switch to the up, RAISE
position. Raise screed fully up.
n.
Remove wood support blocks from under each
end of main screed.
o.
Retract both left and right extension screeds per
paragraph 2.19.
p.
Ensure screed travel lock is open.
q.
Place screed lift switch to the down, FLOAT
position. Lower the screed until the screed rests
on the ground.
r.
Shut down paving machine per paragraph 2.11,
steps a through g.
2-70