CONVEYOR REAR AXLE ASSEMBLY REMOVAL AND INSTALLATION - Continued
Figure 1. Conveyor Idler Assembly -- Removal/Installation.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  1182    1183    1184    1185    1186  1187  1188    1189    1190    1191    1192  
img
. . .
TM 5-3895-385-23-2
0416
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
CONVEYOR IDLER ASSEMBLY REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Personnel Required
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
91L
3, Item 64)
Assistant
Suitable lifting device (200 lb (91 kg) minimum)
Equipment Conditions
Web sling (WP 0440, Vol 3, Item 66)
Conveyor drag chains removed (WP 0417)
Materials/Parts
Estimated Time to Complete Task
Lock washer (4) (WP 0439, Vol 3, Item 107)
3.5 hr
CONVEYOR IDLER ASSEMBLY REMOVAL AND INSTALLATION
NOTE
Conveyor idler assembly removal and installation steps are the same for both sides of the
Bituminous Material Paving Machine (BMPM). Right side shown.
0416-1