• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Conveyor Floor Assembly Installation -- Continued.
Figure 1. Conveyor Rear Axle Assembly -- Removal/Installation.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  1178    1179    1180    1181    1182  1183  1184    1185    1186    1187    1188  
img
. . .
TM 5-3895-385-23-2
0415
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
CONVEYOR REAR AXLE ASSEMBLY REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Personnel Required
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
91L
3, Item 64)
Assistant
Suitable lifting device (200 lb (91 kg) minimum)
Equipment Conditions
Web sling (WP 0440, Vol 3, Item 66)
Conveyor drag chains removed (WP 0417)
Materials/Parts
Estimated Time to Complete Task
Lock washers (1) (WP 0439, Vol 3, Item 107)
3.5 hr
Lock washers (3) (WP 0439, Vol 3, Item 108)
Lock washers (4) (WP 0439, Vol 3, Item 117)
CONVEYOR REAR AXLE ASSEMBLY REMOVAL AND INSTALLATION
NOTE
Conveyor rear axle assembly removal and installation steps are the same for both sides of the
Bituminous Material Paving Machine (BMPM). Left side shown.
0415-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.