TM 5-3895-385-23-2
0338
FOLLOW-ON TASK
2. Install high-pressure fuel injection lines (WP 0331).
4. Connect W25 C3 and C4 to pass-through connectors (WP 0334).
5. Verify proper operation.
6. Dispose of captured fluids and soiled rags IAW local SOP.
END OF TASK
END OF WORK PACKAGE