TM 5-3895-385-23-2
0309
FOLLOW-ON TASK
1. Install all manifold assembly hydraulic solenoids (WP 0312).
2. Install screed raise and lower hydraulic solenoids (WP 0310).
3. Install electric generator hydraulic solenoid coil (WP 0313).
4. Verify proper operation.
5. Dispose of hydraulic oil and wiping rags In Accordance With (IAW) local Standard Operating Procedure
(SOP).
END OF TASK
END OF WORK PACKAGE