• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 10. Electronic Timer -- Installation.
Figure 12. Breaker -- Installation.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  125    126    127    128    129  130  131    132    133    134    135  
img
.
TM 5-3895-385-23-2
0243
Screed Electric Heat Box Assembly -- Continued.
Figure 11. Relay -- Installation.
11. Install two nuts (Figure 11, Item 4), screws (Figure 11, Item 3), and relay (Figure 11, Item 1) onto screed
electric heat box (Figure 11, Item 2).
12. Install six wires (Figure 11, Item 5) onto relay (Figure 11, Item 1).
0243-13


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.