Figure 9. Time Delay Relay -- Installation.
Figure 11. Relay -- Installation.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  124    125    126    127    128  129  130    131    132    133    134  
img
.
TM 5-3895-385-23-2
0243
Screed Electric Heat Box Assembly -- Continued.
Figure 10. Electronic Timer -- Installation.
9. Install screw (Figure 10, Item 7), new lock washer (Figure 10, Item 6), flat washer (Figure 10, Item 5), nut
(Figure 10, Item 2), and electronic timer (Figure 10, Item 1) onto screed electric heat box (Figure 10, Item 4).
10. Install four wires (Figure 10, Item 3) onto electronic timer (Figure 10, Item 1).