• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7. Time Delay Relay -- Removal.
Figure 9. Time Delay Relay -- Installation.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  122    123    124    125    126  127  128    129    130    131    132  
img
.
TM 5-3895-385-23-2
0243
Screed Electric Heat Box Disassembly -- Continued.
Figure 8. Terminal Block -- Removal.
17. Remove two screws (Figure 8, Item 9) and cover (Figure 8, Item 8) from terminal block (Figure 8, Item 3).
CAUTION
Tag and label electrical wires prior to removal. Electrical wires must be installed correctly for
proper operation. Failure to comply may cause damage to equipment.
18. Remove setscrew (Figure 8, Item 11) and wire (Figure 8, Item 12) from terminal block (Figure 8, Item 3).
19. Remove setscrew (Figure 8, Item 6) and wire (Figure 8, Item 4) from terminal block (Figure 8, Item 3).
20. Remove four setscrews (Figure 8, Item 10) and wires (Figure 8, Item 13) from terminal block (Figure 8, Item
3).
0243-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.