• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 13. Push Button Switch and Toggle Switch -- Installation.
Figure 15. Screed Electric Heat Box -- Installation.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  128    129    130    131    132  133  134    135    136    137    138  
img
. .
TM 5-3895-385-23-2
0243
Screed Electric Heat Box Assembly -- Continued.
17. Install push button switch cover (Figure 13, Item 10) and push button switch (Figure 13, Item 8) onto lid
(Figure 13, Item 9).
18. Install two screws (Figure 13, Item 6) and wires (Figure 13, Items 5 and 7) onto push button switch (Figure 13,
Item 8).
Figure 14. Red Light --Installation.
19. Install red light (Figure 14, Item 7) onto screed electric heater box lid (Figure 14, Item 5).
20. Install spade connector (WP 0401) onto red wire (Figure 14, Item 1), and install onto N/C post (Figure 14,
Item 8) on time delay relay.
21. Install nut (Figure 14, Item 2) and ground wire (Figure 14, Item 3) onto ground post (Figure 14, Item 4).
22. Raise screed electric heat box lid, and tighten two screws and clamps on top of screed electric heat box.
END OF TASK
0243-16


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.