Figure 6. Electronic Timer -- Removal.
Figure 8. Terminal Block -- Removal.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  121    122    123    124    125  126  127    128    129    130    131  
img
.
TM 5-3895-385-23-2
0243
Screed Electric Heat Box Disassembly -- Continued.
Figure 7. Time Delay Relay -- Removal.
CAUTION
Tag and label electrical wires prior to removal. Electrical wires must be installed correctly for
proper operation. Failure to comply may cause damage to equipment.
15. Remove five wires (Figure 7, Item 2) from time delay relay (Figure 7, Item 1).
16. Remove screw (Figure 7, Item 7), lock washer (Figure 7, Item 6), flat washer (Figure 7, Item 5), nut (Figure 7,
Item 3), and time delay relay (Figure 7, Item 1) from screed electric heat box (Figure 7, Item 4). Discard lock
washer.
0243-9