TM 5-3895-373-34
2.67
REPLACE MAIN SCREED FRAME - Continued.
D.
INSTALL - Continued.
9.
INSTALL SCREED ARM.
a.
Install sleeve bushings spacers (31) into main
screed pivot bores (32). If necessary, use a
plastic hammer to drive bushing flush with main
screed pivot bores.
b.
With the help of another person, line up screed
arm (33) pivot boss with main screed pivot bores
(32).
c.
Rotate flats of screed arm pivot pin (30) to
vertical. From inside of main screed, install pivot
pin into main screed pivot bores.
WARNING
Thread locking compound can cause
eye
damage.
Wear
safety
goggles/glasses when using. Avoid
contact with eyes. If compound
contacts eyes, flush eyes with water
and get immediate medical attention.
d.
Apply thread locking compound
(Item
13,
Appendix B) to threads of socket head cap
screw (28).
e.
Install retainer (29) and socket head cap screw
(28). Tighten cap screw to 37 lb-ft (50 N.m).
f.
Lubricate screed arm pivot pin (30) with grease
until grease can be seen at main screed pivot
bores.
10.
INSTALL
SCREED
VIBRATION
FLOW
DIVIDER PER PARAGRAPH 2.77.
GO TO NEXT PAGE
2-952