TM 5-3895-373-34
2.65
REPLACE/REPAIR CONVEYOR ROLLER AND BEARING UNITS.
This task covers:
a. Remove
b. Clean
c.
Inspect
d. Replace
INITIAL SETUP:
Tools:
Personnel Required:
General mechanics automotive tool kit
Two 62B construction equipment repairers. Second person to
(Item 106, Appendix D)
assist in support of components during removal and
Torque wrench (Item 132, Appendix D)
installation.
Wire scratch brush (Item 13, Appendix D)
References:
Materials/Parts:
TM 5-3895-373-10
Cleaning cloth (Item 6, Appendix B)
LO 5-3895-373-12
Cleaning solvent (Item 31, Appendix B)
TM 5-3895-373-24P
Grease (Item 18, Appendix B)
Thread locking compound (Item 13, Appendix B)
Equipment Condition:
Thread locking compound solvent (Item 32, Appendix B) Hopper wings lowered per TM 5-3895-373-10.
Lockwashers
Conveyor chain assembly removed per paragraph 2.61.
NOTE
There is a left hand and a right hand
set of conveyor rollers and bearing
units on the paving machine. This
procedure refers to replacement of
the left hand conveyor rollers and
bearing units. Procedure is identical
for right hand conveyor rollers and
bearing units. Left hand conveyor
rollers and bearing units are shown
in this procedure.
GO TO NEXT PAGE
2-884
