TM 5-3895-373-34
F.
INSTALL - Continued.
6.
INSTALL SCREED EXTENSION CYLINDER
EXTEND AND RETRACT HYDRAULIC HOSES.
INSTALL
SCREED
VIBRATION
CONTROL
VALVE AND VALVE TUBES.
a.
Cut
tie
wraps
securing
right
screed
extension cylinder extend hose (33) and
retract hose (32) together.
Hydraulic fitting sealant can cause
eye damage or skin irritation. Wash
after skin contact. Wear safety
goggles/glasses when using. Avoid
contact with eyes or skin. If sealant
contacts eyes, flush eyes with water
and get immediate medical attention.
b.
Apply hydraulic fitting sealant to threads of
straight adapters (102 through 105) and
screed vibration control valve tees (106).
c.
Connect right screed extension cylinder
retract hose (32) and extend hose (33) to
straight adapters (102 and 103).
d.
Position screed vibration control valve in
place and install screed vibration control
valve tubes (28 and 29) to straight adapters
(104 and 105).
e.
Connect screed extension cylinder return
line tube (30) and screed vibration solenoid
valve tube (31) to screed vibration control
valve tees (106).
f.
Apply hydraulic fitting sealant to threads of
straight adapters (107 and 108).
g.
Connect screed extension cylinder retract
hose (26) and extend hose (27) to straight
adapters (107 and 108).
GO TO NEXT PAGE
2-1003