• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BOLT-ON SCREED EXTENSION REPAIR
Bolt-On Screed Extension Vertical Attack Angle Adjustment Screw Installation

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  1290    1291    1292    1293    1294  1295  1296    1297    1298    1299    1300  
img
.
TM 5-3895-385-23-2
0434
BOLT-ON SCREED EXTENSION REPAIR
Bolt-On Screed Extension Vertical Attack Angle Adjustment Screw Removal
Figure 1. Bolt-On Screed Extension Vertical Attack Angle Adjustment Screw -- Removal.
1. Remove two bolts (Figure 1, Item 2) and locking nuts (Figure 1, Item 4) from screed extension bracket (Figure
1, Item 14) and screed extension vertical attack angle adjustment screw housing (Figure 1, Item 3). Discard
locking nuts.
2. Remove two set screws (Figure 1, Item 12) on locking collar (Figure 1, Item 13).
3. Turn jam nut (Figure 1, Item 10) counterclockwise until it reaches the lower screw housing (Figure 1, Item 9).
4. Turn nut (Figure 1, Item 11) counterclockwise until it reaches the jam nut (Figure 1, Item 10).
5. Slide screed extension vertical attack angle adjustment screw housing (Figure 1, Item 3) to nut (Figure 1, Item
11).
0434-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.