TM 5-3895-385-23-2
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
REAR TRACK ROLLERS REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Personnel Required
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
91L
3, Item 64)
Assistant
Suitable lifting device (400 lb (181 kg) minimum)
Equipment Conditions
Web sling (WP 0440, Vol 3, Item 66)
Materials/Parts
Estimated Time to Complete Task
Lock washer (12) (WP 0439, Vol 3, Item 110)
3.3 hr
REAR TRACK ROLLERS REMOVAL AND INSTALLATION
NOTE
Rear track rollers removal and installation steps are the same for both sides of the Bituminous
Material Paving Machine (BMPM). Left side shown.