• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Battery-Charging Alternator -- Installation.
Figure 5. Alternator Pulley -- Removal/Installation.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  755    756    757    758    759  760  761    762    763    764    765  
img
.
TM 5-3895-385-23-2
0350
Battery-Charging Alternator Installation -- Continued.
Figure 4. Battery-Charging Alternator Electrical Connections.
5. Install ground wire (Figure 4, Item 1), new lock washer (Figure 4, Item 11), and bolt (Figure 4, Item 10) onto
ground weldment (Figure 4, Item 2).
6. Install electrical connector (Figure 4, Item 5) into battery-charging alternator (Figure 4, Item 3).
7. Install spacer (Figure 4, Item 6), power wire (Figure 4, Item 9), new lock washer (Figure 4, Item 8), and nut
(Figure 4, Item 7) onto stud (Figure 4, Item 4).
END OF TASK
0350-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.