• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Exhaust Manifold -- Removal/Installation.
BATTERY-CHARGING ALTERNATOR BELT, IDLER PULLEY ASSEMBLY, AND BELT TENSIONER REMOVAL AND INSTALLATION

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  745    746    747    748    749  750  751    752    753    754    755  
img
. .
TM 5-3895-385-23-2
0348
Exhaust Manifold Installation
1. Apply coat of anti-seize lubricant to eight bolts (Figure 1, Item 4).
2. Install eight bolts (Figure 1, Item 4), sleeve spacers (Figure 1, Item 3), exhaust manifold (Figure 1, Item 5),
and four new exhaust manifold gaskets (Figure 1, Item 1) onto cylinder head (Figure 1, Item 2) finger-tight.
Figure 2. Bolt Torque Sequence.
CAUTION
Bolts must be tightened equally and in the sequence shown in Figure 2 to avoid twisting the
manifold. Failure to comply may cause damage to equipment.
3. Torque bolts (Figure 1, Item 4) to 33 foot-pounds (ft-lb) (45 Newton meters (Nm)) in sequence shown in
Figure 2.
END OF TASK
FOLLOW-ON TASK
1. Install turbocharger (WP 0347).
2. Verify proper operation.
3. Dispose of soiled rags In Accordance With (IAW) local standard operating procedures (SOP).
END OF TASK
END OF WORK PACKAGE
0348-3/4 blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.