Figure 3. Turbocharger Connections -- Installation.
Figure 4. Turbocharger Plumbing -- Removal/Installation.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  740    741    742    743    744  745  746    747    748    749    750  
img
TM 5-3895-385-23-2
0347
Turbocharger Installation -- Continued.
11. Install air intake hose (Figure 3, Item 1) and loop clamp (Figure 3, Items 2) onto compressor (Figure 3, Item
3).
12. Install new turbine outlet gasket (Figure 3, Item 7), exhaust connector (Figure 3, Item 8), and four turbine
outlet bolts (Figure 3, Item 9) onto turbine (Figure 1, Item 16).
13. Install exhaust pipe mounting bracket (Figure 3, Item 14) and two bolts (Figure 3, Item 15) to exhaust
manifold (Figure 2, Item 4).
14. Install loop clamp (Figure 3, Item 10) and exhaust pipe (Figure 3, Item 11) onto exhaust connector (Figure 3,
Item 8).
15. Install heat shield (Figure 3, Item 12) and two bolts (Figure 3, Item 13) into exhaust pipe (Figure 3, Item 11).
END OF TASK
0347-7