• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Screed Extension Vertical Attack Angle Adjustment Screw -- Removal.
Figure 2. Screed Extension Vertical Attack Angle Adjustment Screw -- Installation.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  87    88    89    90    91  92  93    94    95    96    97  
img
TM 5-3895-385-23-2
0238
Screed Extension Vertical Attack Angle Adjustment Screw Removal -- Continued.
NOTE
It may be necessary to turn lower screw housing counterclockwise until there is no more room,
then repeat steps 3, 4, and 5, then continue with step 6.
6. Remove bolt (Figure 1, Item 8), flat washer (Figure 1, Item 5), and locking nut (Figure 1, Item 6) from bracket
(Figure 1, Item 7). Discard locking nut.
7. Remove lower screw housing (Figure 1, Item 9) from screed extension vertical attack angle adjustment screw
(Figure 1, Item 1).
8. Remove jam nut (Figure 1, Item 10) and nut (Figure 1, Item 11) from screed extension vertical attack angle
adjustment screw (Figure 1, Item 1).
9. Remove screed extension vertical attack angle adjustment screw (Figure 1, Item 1) from flight screw bearing
(Figure 1, Item 3) and front extension hinge (Figure 1, Item 14).
END OF TASK
0238-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.