• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Screed Extension Vertical Adjustment Screw Installation
Figure 1. Screed Extension Vertical Attack Angle Adjustment Screw -- Removal.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  85    86    87    88    89  90  91    92    93    94    95  
img
. . .
TM 5-3895-385-23-2
0238
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
SCREED EXTENSION VERTICAL ATTACK ANGLE ADJUSTMENT SCREW REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Personnel Required
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
91L
3, Item 64)
Equipment Conditions
Materials/Parts
Screed extension slide plate assembly removed
Locking nut (2) (WP 0439, Vol 3, Item 44)
(WP 0247)
Estimated Time to Complete Task
Locking nut (WP 0439, Vol 3, Item 50)
5 hr
SCREED EXTENSION VERTICAL ATTACK ANGLE ADJUSTMENT SCREW REMOVAL AND INSTALLATION
NOTE
Procedure is the same for all screed extension vertical attack angle adjustment screws. Left
screed extension vertical attack angle adjustment screw shown.
0238-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.