• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Walkboard Installation
SCREED EXTENSION REMOVAL, INSPECTION, AND INSTALLATION

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  68    69    70    71    72  73  74    75    76    77    78  
img
.
TM 5-3895-385-23-2
0234
Walkboard Repair
Figure 2. Walkboard Repair.
1. Remove bolt (Figure 2, Item 3), flat washer (Figure 2, Item 2), and flat washer (Figure 2, Item 4) from
walkboard.
2. Remove rubber handle (Figure 2, Item 6), spring (Figure 1, Item 1), and latch (Figure 1, Item 5) from
walkboard. Discard spring and latch.
3. Install new spring (Figure 1, Item 1) and latch (Figure 1, Item 5) onto walkboard.
4. Install rubber handle (Figure 2, Item 6) onto latch (Figure 1, Item 5).
5. Install bolt (Figure 2, Item 3), flat washer (Figure 2, Item 2), and flat washer (Figure 2, Item 4) onto walkboard.
FOLLOW-ON TASK
1. Remove lifting device.
2. Set BATTERY DISCONNECT switch to ON (TM 5-3895-385-10).
END OF TASK
END OF WORK PACKAGE
0234-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.