TM 5-3895-385-23-2
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
SCREED EXTENSION REMOVAL, INSPECTION, AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Personnel Required
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
91L
3, Item 64)
Assistant
Cap and plug set (WP 0440, Vol 3, Item 11)
References
Crowbar (WP 0440, Vol 3, Item 13)
Equipment Conditions
Drain pan (WP 0440, Vol 3, Item 15)
Screed extensions fully extended (TM 5-3895-385-
Suitable lifting device (500 lb (227 kg) minimum)
10)
Materials/Parts
Lock nut (WP 0439, Vol 3, Item 50)
Lock washer (WP 0439, Vol 3, Item 109)
Estimated Time to Complete Task
Lock washer (36) (WP 0439, Vol 3, Item 124)
4.2 hr
Wiping rag (WP 0439, Vol 3, Item 89)
SCREED EXTENSION REMOVAL, INSPECTION, AND INSTALLATION
NOTE
Screed extension removal and installation steps are the same for both sides of the Bituminous
Material Paving Machine (BMPM). Left side shown.