• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
WALKBOARD REMOVAL, INSTALLATION, AND REPAIR
Walkboard Installation

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  66    67    68    69    70  71  72    73    74    75    76  
img
.
TM 5-3895-385-23-2
0234
WALKBOARD REMOVAL, INSTALLATION, AND REPAIR
Walkboard Removal
Figure 1. Walkboard -- Removal/Installation.
WARNING
The walkboard weighs 146 pounds (lb) (66 kilograms (kg)). Use a suitable lifting device. Failure to
comply may cause injury or death to personnel.
CAUTION
Properly support the item being lifted. Failure to comply may cause damage to equipment.
Do not allow walkboard to twist during removal. Always ensure walkboard will not move
during removal or installation regardless of whether it is attached.
Remove two bolts (Figure 1, Item 4), locking nuts (Figure 1, Item 2), and walkboard (Figure 1, Item 3) from
walkboard mounting bracket (Figure 1, Item 1) with assistance. Discard locking nuts.
END OF TASK
0234-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.