FLIGHT SCREW ASSEMBLY REMOVAL AND INSTALLATION - Continued
Figure 1. Walkboard -- Removal/Installation

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  65    66    67    68    69  70  71    72    73    74    75  
img
.
TM 5-3895-385-23-2
0234
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
WALKBOARD REMOVAL, INSTALLATION, AND REPAIR
INITIAL SETUP:
Tools and Special Tools
Personnel Required
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
91L
3, Item 64)
Equipment Conditions
Suitable lifting device (53 lb (22 kg) minimum)
Screed fully lowered (TM 5-3895-385-10)
Web sling (WP 0440, Vol 3, Item 66)
Engine off (TM 5-3895-385-10)
Materials/Parts
BATTERY DISCONNECT switch OFF (TM 5-3895-
Locking nut (WP 0439, Vol 3, Item 54)
385-10)
Estimated Time to Complete Task
0.3 hr
0234-1