• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Tilt Screw -- Removal/Installation
DEPTH SCREW REMOVAL AND INSTALLATION

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  32    33    34    35    36  37  38    39    40    41    42  
img
.
TM 5-3895-385-23-2
0226
Tilt Screw Installation
1. Install straight pin (Figure 1, Item 4) along with spacer (Figure 1, Item 3) into screed extension (Figure 1, Item
2).
2. Install tilt screw shaft (Figure 1, Item 9) onto end gate.
3. Install two bolts (Figure 1, Item 6), new lock washers (Figure 1, Item 7), and tilt screw bracket (Figure 1, Item
8) onto mounting bracket (Figure 1, Item 1).
4. Install tilt screw (Figure 1, Item 5) into straight pin (Figure 1, Item 4) and into tilt screw shaft (Figure 1, Item 9).
END OF TASK
FOLLOW-ON TASK
Set BATTERY DISCONNECT switch to ON (TM 5-3895-385-10).
END OF TASK
END OF WORK PACKAGE
0226-3/4 blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.