• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
END GATE INSTALLATION -- CONTINUED
Figure 1. Tilt Screw -- Removal/Installation

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  30    31    32    33    34  35  36    37    38    39    40  
img
. .
TM 5-3895-385-23-2
0226
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
TILT SCREW REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Equipment Conditions
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
Engine off (TM 5-3895-385-10)
3, Item 64)
BATTERY DISCONNECT switch OFF (TM 5-3895-
Materials/Parts
385-10)
Lock washer (2) (WP 0439, Vol 3, Item 117)
Estimated Time to Complete Task
Personnel Required
0.2 hr
91L
TILT SCREW REMOVAL AND INSTALLATION
NOTE
Tilt screw removal and installation steps are the same for both sides of the Bituminous Material
Paving Machine (BMPM). Left side shown.
0226-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.