TM 5-3895-385-10
0014
OPERATOR MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
END GATE REMOVAL AND INSTALLATION
INITIAL SETUP:
References
Tools and Special Tools
WP 0013
9/16 inch combination wrench (WP 0031, Item 16)
WP 0023
1 1/4 inch combination wrench (WP 0031, Item 19)
Equipment Conditions
Materials/Parts
Screed extensions fully extended (WP 0006)
Lock nut (WP 0033, Item 14)
Screed fully lowered (WP 0006)
Lock washer (WP 0033, Item 18)
Personnel Required
Engine off (WP 0006)
12V (4)
BATTERY DISCONNECT switch OFF (WP 0004)
Time Required
0.5 hr
END GATE REMOVAL AND INSTALLATION
NOTE

The procedure for installation and removal of the end gate is the same whether being
performed on the screed extension or bolt-on screed extension.

The procedure for installation and removal of the end gate is the same whether being
performed on the left side or right side. Left side shown.
0014-1