• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
EXPLANATION OF THE COLUMNS FOUND IN THE PMCS TABLE
Table 1. Preventive Maintenance Checks and Services (PMCS) Instructions.

Technical Manual For Bituminous Material Paving Machine (Bmpm) Page Navigation
  185    186    187    188    189  190  191    192    193    194    195  
img
. . . . . . . . . . . . . . . .
TM 5-3895-385-10
0013
OPERATOR MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
INITIAL SETUP:
References -- Continued.
Tools and Special Tools
WP 0019
Hand lubricating gun (WP 0031, Item 7)
Materials/Parts
WP 0020
Wiping rag (WP 0033, Item 15)
WP 0021
Personnel Required
WP 0022
12V (1)
WP 0023
References
LO 5-3895-385-13
Equipment Conditions
Keyless engine switch OFF (WP 0004)
WP 0007
Screed fully lowered (WP 0006)
WP 0009
Screed extensions fully extended (WP 0006)
WP 0017
Cutoffs fully closed (WP 0006)
WP 0018
BMPM cool (Before procedures only)
0013-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.