TM 5-3895-385-10
0013
Table 1. Preventive Maintenance Checks and Services (PMCS) Instructions -- Continued.
ITEM TO BE
CHECKED OR
ITEM
EQUIPMENT NOT
NO.
READY/AVAILABLE IF:
SERVICED
INTERVAL
PROCEDURE
Figure 29. Right Cutoff and Auger.
117
After
Right Auger and
Check auger (Figure 29, Item 1),
Damage that would
Cutoff
cutoff (Figure 29, Item3), and
impair operation or class
hydraulic cylinder and hoses
III leaks are evident.
(Figure 29 Item 2) for damage or
leaks.