TM 5-3895-373-34
B.
INSTALL.
1.
INSTALL TEES AND ELBOWS ONTO SCREED
VIBRATION CONTROL VALVE.
a.
Use cleaning cloth to wipe residue from threads
of tees (6) and elbows (7).
b.
Remove set screw (8) from screed vibration
control valve (1).
Thread locking compound can cause
eye
damage.
Wear
safety
goggles/glasses when using. Avoid
contact with eyes. If compound contacts
eyes, flush eyes with water and get
immediate medical attention.
c.
Apply thread locking compound to threads of set
screw (8).
d.
Reinstall set screw (8) into screed vibration
control valve (1) adjustment knob. Do not
tighten set screw; make sure adjustment knob
turns freely.
Hydraulic fitting sealant and pipe sealant
can cause eye damage or skin irritation.
Wash after skin contact. Wear safety
goggles/glasses when using. Avoid
contact with eyes or skin. If sealant
contacts eyes, flush eyes with water and
get immediate medical attention.
e.
Apply pipe sealant to pipe threads of elbows (7).
f.
Install elbows (7) onto screed vibration control
valve (1). Tighten elbows so that the elbows will
face away from the adjustment knob.
g.
Apply hydraulic fitting sealant to threads of
elbows (7).
NOTE
Ensure free flow arrow is positioned
correctly when installing fittings.
h.
Install tees (6). Tighten tees so that the side
opening on tees will face as shown in the
illustration.
GO TO NEXT PAGE
2-793
