TM 5-3895-373-10n.Install the strikeoff extension assembly using thefollowing steps.(1)Install strikeoff extension assembly (37)using hex head cap screws (38), flatwashers (39), and self-locking nuts (40).Visually check to see that bottom edge ofbolt-on strikeoff extension assembly plateis even with the bottom of screedextension strikeoff plate.(2)Loosen hex head cap screw (41) and self-locking nut (42). Line up strikeoff support(43) with hole in bolt-on screed extensionframe (34) and install flat washer (44) andhex head cap screw (45). Do not tightenhex head cap screws (41 and 45).o.Install the endgate assembly using the followingsteps.WARNINGTo avoid personal injury, do notattempt to lift and install endgatesupport arm and endgate alone.Endgate support arm weighsapproximately 126 lbs (57,1 kg). Usea second person to help lift andinstall the endgate support arm andendgate to the screed extensionframe. Failure to do so may result inserious injury.(1)With the help of a second person liftendgate (3) and endgate support arm (7)onto bolt-on screed extension frame (34)after inserting endgate mounting tab (5) inbolt-on screed extension frame. Secureendgate support arm with flat washers(17) and hex head cap screws (16).(2)Carefully level endgate (3) and connectchains (4) to endgate hand levers (2).(3)Bolt endgate support arm (7) to thestrikeoff extension assembly (37) usinghex head cap screws (14), spacer (15),flat washers (13), and self-locking nuts(12).(4)Tighten hex head cap screws (45).Tighten hex head cap screw (41) and self-locking nut (42).p.Connect feed limit switch connector (1) to theconnector on the rear wall of the tractor.2-86
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business