• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Flat Strike-off Adjusted Too Low
INSTALLATION OF SCREED EXTENSION

Maintenance Manual For Paving Machine Bituminous Materiel Crawler Mounted Ded Page Navigation
  246    247    248    249    250  251  252    253    254    255    256  
img
ASSEMBLY OF SCREED EXTENSION
5. Install the two Adjusting Bolt assemblies
1. Run a " NC tap through the screw holes for
using
strike-off plate to clean out paint and dirt.
* a hex nut above the bracket and one below.
(The special screws are not locally available.)
6. Run a /2" NC tap through the screw hole in
2. Install the Support. Tighten the two flat-head
each Adjusting Bolt assembly to clean out
* socket screws.
paint and dirt.
7. Install the Strike-Off Plate using all of the
3. Install the Bracket and the Height Gauge.
special parts shown in Illustration 8, arranged
exactly as shown! Tighten Shoulder Screws.
4. Install a Gauge Pointer on each of the two
8. Arrange the Seal and the three Washers on
Adjusting Bolts.
each Shoulder Screw as shown above
Page 63


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.