TM 5-3895-385-23-2
0395
NATO Slave Receptacle Installation -- Continued.
Figure 5. Hydraulic Cover Vent -- Installation.
5. Install 10 bolts (Figure 5, Item 2), new lock washers (Figure 5, Item 3), flat washers (Figure 5, Item 4), and
hydraulic cover vent (Figure 5, Item 1) to side left plate (Figure 5, Item 5).
END OF TASK
FOLLOW-ON TASK
END OF TASK
END OF WORK PACKAGE