• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
WORKLIGHT REMOVAL AND INSTALLATION
Figure 2. Operator Platform Worklight -- Removal/Installation.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  1072    1073    1074    1075    1076  1077  1078    1079    1080    1081    1082  
img
.
TM 5-3895-385-23-2
0396
Screed Worklight Removal
Figure 1. Screed Worklight -- Removal/Installation.
1. Disconnect screed worklight connector (Figure 1, Item 5) from worklight connector (Figure 1, Item 4).
2. Remove locking nut (Figure 1, Item 3) and screed worklight (Figure 1 Item 1) from screed control (Figure 1,
Item 2). Discard locking nut.
END OF TASK
Screed Worklight Installation
1. Install screed worklight (Figure 1 Item 1) and new locking nut (Figure 1, Item 3) on screed control (Figure 1,
Item 2).
2. Connect screed worklight connector (Figure 1, Item 5) with worklight connector (Figure 1, Item 4).
END OF TASK
0396-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.