• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Right Screed Worklight Wiring Harness -- Disconnect/Connect.
LEFT SCREED WORKLIGHT WIRING HARNESS REMOVAL AND INSTALLATION

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  1021    1022    1023    1024    1025  1026  1027    1028    1029    1030    1031  
img
.
TM 5-3895-385-23-2
0389
Right Screed Worklight Wiring Harness Removal -- Continued.
Figure 2. Right Screed Worklight Wiring Harness -- Removal/Installation.
END OF TASK
Right Screed Worklight Wiring Harness Installation
1. Route right screed worklight wiring harness through pass-through (Figure 2, Item 6).
2. Install two bolts (Figure 2, Item 2), flat washers (Figure 2, Item 3), and clamps (Figure 2, Item 1) onto screed.
3. Connect W20 J2 (Figure 2, Item 5) onto right screed worklight (Figure 2, Item 4).
4. Connect W20 J1 (Figure 1, Item 2) onto W1 J41 (Figure 1, Item 1).
END OF TASK
FOLLOW-ON TASK
1. Install cable ties where necessary.
2. Turn BATTERY DISCONNECT switch ON (TM 5-3895-385-10).
END OF TASK
END OF WORK PACKAGE
0389-3/4 blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.